Providers on the topic

Figure 1. USFDA three-stage process validation guideline, 2011 (Source: Ima Life)
Case Study Focusing on the Impact of Transient Pressure Excursions on Lyophilized Product Quality

Significance of Process Performance Qualification Approach for Process Validation

Process performance qualification (PPQ) runs are essential for ‘at-scale’ verification of the robustness of R&D lyo-processes, as these runs can often unravel challenges not encountered at the R&D scale. This case study exhibits the loss of pressure control in a commercial lyophilizer during PPQ runs of a parenteral product, its root cause analysis and finally, its resolution via remote PID-tuning performed by IMA Lab4Life scientists.

Read on
Ineos Olefins Belgium has plans to create Europe's most eco-friendly and sustainable cracker project at the port of Antwerp in Belgium at a whooping cost of 3+ billion euros.   (Source: Ineos Olefins )
Project One

Coming Soon: Europe’s Most Sustainable Cracker!

In line with the goals of the European Green Deal, Ineos Olefins Belgium has plans to create the region’s most eco-friendly and sustainable cracker project ever at a whooping cost of 3+ billion euros. The landmark ‘Project One’ will be located at the port of Antwerp in Belgium and will make use of the latest technologies to produce ethylene with the lowest carbon footprint in all of Europe.

Read on

Galleries

95230992 (Source: Siemens)
Process Control

Stepping Stone to the Future: Control System Modernization at Evonik Plant

In the chemical industry, research facilities create the link between laboratory development and industrial-scale production. Flexible plants comprising multiple areas are sites of innovation and testing, acting as stepping stones for subsequent scale-up. When Evonik Industries was looking to modernize such a plant at the Wolfgang Industrial Park in Hanau, Germany, it was the perfect place to use Simatic PCS neo, the completely web-based process control system from Siemens.

Read on