Progress on the feasibility study is advancing as planned.  (Source: Pixabay)
Clayton Valley Lithium Project

Thyssenkrupp Nucera Wins Contract for Designing, Engineering Chlor-Alkali Plant

Cypress Development is conducting a feasibility study for the Clayton Valley Lithium Project in Nevada, USA. In this background, thyssenkrupp nucera has been selected to carry out the designing and engineering for a chlor-alkali plant which will help the project to self-generate two key reagents for processing lithium-bearing claystone in order to produce lithium carbonate products.

Read on

Providers on the topic

Galleries

Plant manufacturer Igas Energy has turned its focus here to the high-pressure PEM electrolysis of water. (Source:Igas Energy)
Plant Design for Hydrogen

How to Provide Efficient Plant Design for Compact Hydrogen Electrolyzers

Successful integration of green hydrogen into production networks – Compact electrolysis plants, powered by green electricity, could help to solve the issue of energy storage, providing power and raw materials available for a wide range of applications. But setting up a container plant is not enough: Sahll the decentralized H2 production become a success, it needs to be suitably integrated and connected. Is the energy transition a matter of plant planning and design?

Read on