Jacobs Engineering Group announced that it was selected by Therma Visayas (TVI), a subsidiary of Aboitiz Power Corporation, for the role of owner’s engineer for the construction of a new 2 x 150 Megawatt electric (MWe) circulating fluidized bed (CFB) coal-fired power plant in Barangay Bato, Toledo City, Philippines.Company officials did not disclose the contract value. The plant is scheduled for completion in 2017.
Read on