Industry Update LNG Cannot be Transported by Pipelines: President, CEO of Qatar Energy

Source: Press release Qatar Energy 3 min Reading Time

Related Vendor

His Excellency Saad Sherida Al-Kaabi, the Minister of State for Energy Affairs, the President and CEO of Qatar Energy recently spoke at the Qatar Economic Forum Special Edition in New York. At the event he shared his views on alternative routes and mentioned that LNG cannot be transported via pipelines.

His Excellency Saad Sherida Al-Kaabi, the Minister of State for Energy Affairs, the President and CEO of Qatar Energy at the Qatar Economic Forum Special Edition in New York, USA. (Source:  Qatar Energy)
His Excellency Saad Sherida Al-Kaabi, the Minister of State for Energy Affairs, the President and CEO of Qatar Energy at the Qatar Economic Forum Special Edition in New York, USA.
(Source: Qatar Energy)

Doha/Qatar – His Excellency Saad Sherida Al-Kaabi, the Minister of State for Energy Affairs, the President and CEO of Qatar Energy, thanked Qatar’s neighbors who welcomed the use of their territories for a pipeline that bypasses the Strait of Hormuz.

His Excellency the Minister said: “We are grateful for our neighbors who have welcomed us to use their territories. However, not everything can be transported via pipelines. The problem is that LNG, our main export commodity, cannot be transported by pipelines. We will have to transport it by pipelines as gas and then liquify it at receiving terminals wherever that may be. This means we are building redundant facilities to the ones we are already building in Qatar as part of the North Field expansion project. This makes no economic sense.”

“We have decided not to use pipelines as an alternative based on commercial and technical criteria,” Minister Al-Kaabi added.

His Excellency made the remarks during a conversation on “The Global Energy Realignment” at the Qatar Economic Forum 2026, which was held, for the first time, in New York city to coincide with the 81st United Nations General Assembly high-level meetings.

On damage to Qatar’s gas production facilities and a possible return to production, H.E. Minister Al-Kaabi said the attacks on Ras Laffan have resulted in damage to two LNG trains and a GTL plant. He added: “Repairs on the GTL train will be concluded in the first quarter of 2027. However, it will take three years for repairs on the two LNG trains.”

Stay up to Date

Do you want the latest news, specialist articles and information on new products? Then you can register for our free newsletter:

Choose your Newsletter

“As for resuming operations,” the Minister added, “Qatar is ready to resume normal operations within a few weeks of the reopening of the Strait of Hormuz.”

On force majeure, Minister Al-Kaabi said, “Throughout our history, we have been a reliable producer and supplier with zero defaults on any shipment. But this is absolutely beyond our control.”

H.E. rejected the notion that the Strait of Hormuz was obsolete, saying: “It is wrong to call the Strait of Hormuz obsolete as this waterway carries trade in all products, not only oil and gas, to and from all its adjacent countries. Minister Al-Kaabi stressed the need for normal movement across the Strait saying: “the countries around the Gulf are neighbors and will remain neighbors for generations to come. Thus, we need to have good relations with our neighbors.”

Answering a question on reports that Qatar was buying LNG volumes from the market, His Excellency said: “I have announced in 2024 that we're building one of the largest LNG trading organizations, and I did mention that it is going to be very large. I would like to mention today that, in the very near future, we will be the largest LNG trader in the world by far. And we're building our position to become the largest trader.”

Answering a question of Qatar Energy’s projects in the United States, His Excellency the Minister of State for Energy Affairs, the President and CEO of Qatar Energy said shipments have started from the first train at Golden Pass LNG. “We expect next year to have both the second and third trains in full operation. We are also building the largest ethane cracker in the world at the Golden Triangle Polymers project. The project has started its commissioning process as we speak. It should be starting up in the next few weeks.”

The Qatar Economic Forum, powered by Bloomberg, is the Middle East’s leading news-driven event dedicated to global business and investment.

(ID:50979526)

Subscribe to the newsletter now

Don't Miss out on Our Best Content

By clicking on „Subscribe to Newsletter“ I agree to the processing and use of my data according to the consent form (please expand for details) and accept the Terms of Use. For more information, please see our Privacy Policy. The consent declaration relates, among other things, to the sending of editorial newsletters by email and to data matching for marketing purposes with selected advertising partners (e.g., LinkedIn, Google, Meta).

Unfold for details of your consent