The ramp-up and production lines for Britishvolt are scheduled to be commissioned in September 2023 and spring 2024, respectively.   (Source: Bühler)
Batteries for EV

Britishvolt Selects Low-Carbon Battery Mixing Technology for its First Full-Scale Gigaplant in UK

Bühler's battery mixing technology has the capability to reduce waste by 95 % and ensures an energy savings of 50 %. This technology will be used for Britishvolt's first Gigaplant in Northumberland, UK wherein Bühler will supply large scale production lines for the manufacture of electrode slurries which is a vital component for the production of high-performance batteries.

Read on
The collaboration will commence with feasibility studies on technical and economic aspects of the green e-methanol pilot plant which are expected to be completed by the end of 2022.  (RoBonc - stock.adobe.com)
Low Carbon Fuels

Southeast Asia to Get its First Green E-Methanol Plant

A consortium comprising of six firms have collaborated to develop Asia’s first green e-methanol plant. Capable of converting captured biogenic carbon dioxide and green hydrogen produced from renewable electricity into green e-methanol, the pilot plant will be established in Singapore and the low-cost fuel will be supplied to the maritime industry.

Read on