Jörgen Wrennfors (Siemens – from left), Tobias Andersson (Borealis) and Mats Hagman (Siemens) in front of the cracker plant in Stenungsund, which is online 24 hours a day. Reliable operating techniques are helping to guarantee availability. (Picture: Siemens)
Compressor Motor

How a 24.5 MW Compressor Motor Guarantees Production in the Petrochemical Industry

The plant at Borealis in Stenungsund (Sweden) operates 24 hours a day, year after year. The process is only stopped every six years for service and maintenance to be carried out. Borealis has now replaced the raw gas compressor motor at the cracker plant in order to boost capacity and ensure continuous operation. A 24.5 MW motor will ensure the operational availability of the petrochemical plant.

Read on
Argex Titanium has developed a proprietary mineral extraction process that allows for the production of high purity pigment grade titanium dioxide (TiO2) product which can be sold to the end-users in the paint, plastic, coating, food, cosmetics and pharmaceutical industries. (Picture: Argex)
EPC Contract

Argex Titanium To Build New Titanium Dioxide Plant

Argex Titanium, an producer of high-grade titanium dioxide (TiO2) has announced that its newly formed, wholly-owned subsidiary, Argex Canada has awarded an Engineering, Procurement and Construction (EPC) contract to the Tecnicas Reunidas Group (TR) for Argex’s first industrial scale 50,000 tons per annum Titanium Dioxide (TiO2) plant, which will be located in Salaberry-de-Valleyfield, Canada.

Read on