Search

Kazakhstan: FEED Contract Tengizchevroil Chooses Fluor for Multi-Phase Pump Project

Editor: Alexander Stark

Fluor Corporation announced its joint venture team, KPJV, has been selected by Tengizchevroil (TCO) to execute the front-end engineering and design for the Multi-Phase Pump Project in Kazakhstan.

Related Companies

KPJV, has been selected by Tengizchevroil LLP (TCO) to execute the front-end engineering and design (FEED) for the Multi-Phase Pump Project in Kazakhstan.
KPJV, has been selected by Tengizchevroil LLP (TCO) to execute the front-end engineering and design (FEED) for the Multi-Phase Pump Project in Kazakhstan.
(Source: Tengizchevroil LLP)

Irving/USA — Part of TCO’s major capital program, the project will implement multi-phase pump technology across the gathering network of existing oil and gas facilities at the Tengiz and Korolev fields to maintain crude production by reducing wellhead pressure and increasing well deliverability. The project also includes the modification or upgrade of some utility systems.

The project scope includes FEED, detail design and procurement services.

The integrated project team will be based at Fluor’s Farnborough, UK office, providing strong links to TCO’s Future Growth Project — Wellhead Pressure Management team also located in the office.

The engineering contractor began working in Kazakhstan in 1982 and at Tengiz in 1997 on a condensate stabilization project and its joint venture is currently executing the world-scale Future Growth Project.

(ID:44513675)