Angola: EPC Technip FMC Wins Total’s Subsea Contract for Zinia 2 Field

Editor: Ahlam Rais

The scope of work includes EPC of subsea equipment which also comprises 9 subsea tree units, wellheads, subsea control systems, connection systems and associated equipment.

Related Vendors

Technip FMC has been awarded a contract by Total E&P Angola for the Zinia Phase 2 field development which is located offshore Angola at a water depth between 800 and 1,000 m.
Technip FMC has been awarded a contract by Total E&P Angola for the Zinia Phase 2 field development which is located offshore Angola at a water depth between 800 and 1,000 m.
(Source: Deposit Photos)

London/UK – Technip FMC has recently been awarded a contract by Total E&P Angola for the Zinia Phase 2 field development. The project is located offshore Angola at a water depth between 800 and 1,000 meters.

The contract covers the Engineering, Procurement and Construction of subsea equipment including 9 subsea tree units as well as wellheads, subsea control systems, connection systems and associated equipment. This contract also covers support services, performed by Technip FMC in Angola, for the assembly, test, mobilisation and installation.

Subscribe to the newsletter now

Don't Miss out on Our Best Content

By clicking on „Subscribe to Newsletter“ I agree to the processing and use of my data according to the consent form (please expand for details) and accept the Terms of Use. For more information, please see our Privacy Policy.

Unfold for details of your consent

(ID:45400484)