German China India

USA: Jacobs Wins Contract

Engineering Services for New LAO Unit

| Editor: Alexander Stark

(Source: Jacobs)

Jacobs Engineering Group received a contract from Ineos Oligomers to design and build a large linear alpha olefin (LAO) unit at the Ineos petrochemical complex in Chocolate Bayou, Texas.

Pasadena/USA — The LAO unit is expected to come online in November 2018, with a production capacity of 420,000 metric tons per annum.

Jacobs is providing engineering, procurement and construction services for the new unit, which is based on proprietary and differentiated Ineos Oligomers technology. In making the announcement, Jacobs Senior Vice President Petroleum and Chemicals Manuel Junco stated, “With a streamlined project execution approach, our team is committed to delivering a safe, innovative facility that allows Ineos to meet increasing demand for LAO in the Gulf Coast region and beyond.”

Comments are being loaded ....

Leave a comment

The comment is checked by an editor and will be released soon.

  1. Avatar
    Avatar
    Edited by at
    Edited by at
    1. Avatar
      Avatar
      Edited by at
      Edited by at

Comments are being loaded ....

Report comment

Kommentar Freigeben

Der untenstehende Text wird an den Kommentator gesendet, falls dieser eine Email-hinterlegt hat.

Freigabe entfernen

Der untenstehende Text wird an den Kommentator gesendet, falls dieser eine Email-hinterlegt hat.

copyright

This article is protected by copyright. You want to use it for your own purpose? Infos can be found under www.mycontentfactory.de (ID: 44273196 / Engineering)